HYDROGEN SERVICE BAYS | MARATHON FINISHING SYSTEMS Maintenance & Operator Readiness Project: ____________________ Date: __________ Contact: ____________________ [ ] Maintain an inventory of installed components and their manuals. [ ] Assign qualified personnel for inspections, testing, calibration, and servicing. [ ] Record the maintenance intervals specified for the installed equipment. [ ] Keep a dated service log and document faults and corrective work. [ ] Maintain current operator training and site response contacts. [ ] Review proposed vehicle, layout, or equipment changes with the project team. Planning notes: ____________________________________________________________________________ ____________________________________________________________________________ This checklist supports project planning. It is not an installation, operating, commissioning, or emergency response procedure. Follow the approved project documents, vehicle manufacturer procedures, and equipment manuals. Guide: https://hydrogenservicebays.leadstosalesdemo.com/resources/guides/maintenance-planning Contact: info@marathonfinishing.com | (310) 791-5601