Plan Before the Vehicles Arrive
Use this checklist to organize the information Marathon needs for an initial service-bay discussion. Final requirements are established through project-specific engineering and local review.
VEHICLES
Vehicle type; largest length, width and height; hydrogen storage location; lift or access requirements.
SERVICE WORK
Anticipated maintenance tasks; defueling or isolation procedures; number of service positions; expected daily throughput.
FACILITY
Clear height; ceiling geometry; columns and obstructions; doors; available floor area; roof and wall conditions.
UTILITIES & SYSTEMS
Available electrical service; make-up air; exhaust routing; building alarms; fire protection; emergency power requirements.
PROJECT
Site address; new construction or retrofit; project schedule; drawings; engineering contacts; permitting and AHJ contacts.
OPERATIONS
Facility safety plan; emergency-response coordination; technician qualification; vehicle-manufacturer procedures.
This checklist supports early planning only. It is not an engineering determination, code analysis or approval.